Text Size: Small Medium Large

This Old House

Latest Episodes

Watch
//player.pbs.org/partnerplayer/wLZAV-nDp1bCmShyFHHFGg==/?topbar=false&end=0&endscreen=true&start=0&autoplay=false The new propane tank gets buried in the backyard. Norm Abram advises an apprentice in composite decking. Jeff Sweenor and Tom Silva add final touches to the coffered ceiling. A shelving system goes into the new office. Outside Mark McCullough applies a stone veneer to the new chimney. /episodes/get/98153 /episode/98153 Tanks for the Propane | The Westerly Ranch House /episode-player/98153

Propane tanks; composite decking; coffered ceiling; shelves; chimney.

Air date:
Sun, 11/24/2019 - 02:00
Watch
//player.pbs.org/partnerplayer/e55LIzOkz6rjsYOwxNortw==/?topbar=false&end=0&endscreen=true&start=0&autoplay=false Tom Silva and Jeff Sweenor begin work on a coffered ceiling in the living room. Jenn Nawada watches as local Westerly granite is cut to size for backyard steps. Richard Trethewey reviews the complex septic system as it goes in. In Ohio, Kevin O'Connor learns how the interior doors are built.... /episodes/get/97944 /episode/97944 The Doors | The Westerly Ranch House /episode-player/97944

Coffered ceiling; Westerly granite; Septic system review; Interior doors.

Air date:
Sun, 11/17/2019 - 02:00
Watch
//player.pbs.org/partnerplayer/MYyjRQiEro7Ju0QU-fV_wQ==/?topbar=false&end=0&endscreen=true&start=0&autoplay=false Kevin O'Connor reviews the progress of the Westerly house. Tom Silva and Jeff Sweenor work on the main staircase at Jeff’s shop and then they bring it to the house to install. At the Idea House, Kevin looks at new clapboard siding technology. Richard Trethewey tours a factory to see how a... /episodes/get/97714 /episode/97714 Return to Paradise | The Westerly Ranch House /episode-player/97714

Main staircase; clapboard at the Idea House; Westerly granite; furnace build.

Air date:
Sun, 11/10/2019 - 02:00
Watch
//player.pbs.org/partnerplayer/JutCKT5y2ULyMd6hEqLIMA==/?topbar=false&end=0&endscreen=true&start=0&autoplay=false Tom Silva teaches the new apprentices to frame a deck. Jeff Sweenor’s crew frames the exterior flair detail. Jenn Nawada learns about Westerly granite. Jeff teaches the apprentices to install a window. Richard Trethewey and Jeff look for a path for the drain stacks. /episodes/get/97713 /episode/97713 Decking for Beginning | The Westerly Ranch House /episode-player/97713

Framing a deck and exterior flair; Westerly granite; installing a window; drain stacks.

Air date:
Sun, 11/03/2019 - 02:00
Watch
//player.pbs.org/partnerplayer/MwQnwZKiH5j-gcRi0MwYFg==/?topbar=false&end=0&endscreen=true&start=0&autoplay=false The gambrel roof profiles are pre-assembled and raised. Then the crew stands up the second floor walls. Three new apprentices arrive as part of the Generation Next program. Tom Silva, shows them how to measure and cut roof rafters. Richard Trethewey works with an engineer who is designing a septic... /episodes/get/97314 /episode/97314 Raise a Second Story | The Westerly Ranch House /episode-player/97314

The crew stands up the second floor walls. New apprentices arrive.

Air date:
Sun, 10/27/2019 - 03:00
Watch
//player.pbs.org/partnerplayer/GyUG6P2tT8vLgR3JrkUKvQ==/?topbar=false&end=0&endscreen=true&start=0&autoplay=false The crew places a center beam in the old ranch house to support the second story. A hole is cut in the original foundation for a new basement window. Kevin visits an engineered lumber factory in Canada. Back at the project, Tommy and Jeff raise the end gables. /episodes/get/97105 /episode/97105 The Open Concept | Westerly Ranch House /episode-player/97105

Second story support, new basement window, lumber factory visit, and raising gables.

Air date:
Sun, 10/20/2019 - 03:00
Video Title
 
 
 

Pages